DUKSTAS BESS PARK 12 MW / 30 MWh
Finalised
The Dukstas BESS Park is a 10 MW / 20 MWh battery energy storage system planned in the Dukstas area of the Ignalina region, Lithuania. Strategically connected to the 10/35/110 kV Dukstas substation, the project offers a highly cost-effective and technically optimized grid connection point.
UTENA BESS PARK I 8 MW / 20 MWh
Finalised
Utenos BESS parkas – tai 8 MW baterijų energijos kaupimo sistema, esanti Utenos regione, Lietuvoje; tolimesni projekto realizacijos darbai jau vykdomi.
AKMENE BESS PARK 100 MW / 200 MWh
Finalised
The Akmene BESS Park is a 100 MW / 200 MWh battery energy storage system planned in the Akmenė district. Strategically connected to the new 30/330 kV transformer substation, the project ensures a highly cost-effective and technically optimized grid connection point.